This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
|
coach-wiki:working_with_sponsors [2021/11/12 16:33] 127.0.0.1 external edit |
coach-wiki:working_with_sponsors [2022/08/18 12:36] (current) etwitch2 |
||
|---|---|---|---|
| Line 2: | Line 2: | ||
| ====== Working With Sponsors ====== | ====== Working With Sponsors ====== | ||
| - | We couldn' | + | We couldn' |
| and the projects they provide. | and the projects they provide. | ||
| their participation in Capstone to be valuable. | their participation in Capstone to be valuable. | ||
| - | is greatly influenced by the coach. Please | + | is greatly influenced by the coach so please |
| the sponsor. | the sponsor. | ||
| - | =====Maintain communication with the sponsor===== | + | **//Maintain communication with the sponsor//** |
| The single most important thing you can do to ensure a positive experience for the | The single most important thing you can do to ensure a positive experience for the | ||
| sponsor is to maintain regular communication with the sponsor. | sponsor is to maintain regular communication with the sponsor. | ||
| Line 17: | Line 18: | ||
| your project. | your project. | ||
| about the project. | about the project. | ||
| - | to your team. Remind the liaison of the team assignment date, as shown on the coach | + | to your team. Remind the liaison of the team assignment date, as shown on the [[https:// |
| - | checklist. | + | |
| - | Your second sponsor contact should be with your team, and will likely | + | Your second sponsor contact should be with your team and will likely |
| take place at the end of the Product Development Introduction. | take place at the end of the Product Development Introduction. | ||
| during the Product Development Introduction, | during the Product Development Introduction, | ||
| Line 29: | Line 29: | ||
| Throughout the course of the project, you should have regular communication with the liaison, | Throughout the course of the project, you should have regular communication with the liaison, | ||
| both with and without the team. You and the liaison can work together to help the team | both with and without the team. You and the liaison can work together to help the team | ||
| - | succeed. | + | succeed. If there are any concerns or problems with the sponsor, contact the External Relations Manager over your project. |
| - | =====Help the sponsor help the team===== | + | **//Sponsor relationship with the team//** |
| The project sponsor carries a unique influence with the team. | The project sponsor carries a unique influence with the team. | ||
| Line 43: | Line 43: | ||
| project. | project. | ||
| team should be doing, but they are too busy or distracted to heed your advice, you | team should be doing, but they are too busy or distracted to heed your advice, you | ||
| - | can ask the sponsor to make the request | + | can ask the sponsor to make the request |
| the sponsor, it can often carry much more weight than when it comes from the coach or the | the sponsor, it can often carry much more weight than when it comes from the coach or the | ||
| instructors. | instructors. | ||