User Tools

Site Tools


project-wiki:artifacts:decision_levels

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
project-wiki:artifacts:decision_levels [2023/08/16 12:34]
mlhicks
project-wiki:artifacts:decision_levels [2023/08/31 15:48] (current)
mlhicks
Line 1: Line 1:
-<-common_artifacts_table|Common Artifacts Table^Artifact Overview^Decision Levels->+<-common_artifacts_table|Common Artifacts Table^Artifact Overview^Design Artifacts->
 ======Decision Levels and Required Artifacts===== ======Decision Levels and Required Artifacts=====
  
-Artifacts are a fundamental part of the design process.  They play a key role in documenting decision decisions. Kelly Johnson of the Lockheed Skunk Works (which was responsible for creating the U2, the SR-71, and F117) had 14 rules to allow flexibility and rapid progress in the Skunk Works [[https://www.lockheedmartin.com/en-us/who-we-are/business-areas/aeronautics/skunkworks/kelly-14-rules.html|(Skunk Works Rules)]]. Two of these rules that are related to artifacts are "A very simple drawing and drawing release system with great flexibility for making changes must be provided", and "There must be a minimum number of reports required, but important work must be documented thoroughly." As you consider what artifacts are necessary, we believe it is helpful to think of the decision you are making and how it relates to the needed artifacts.+Artifacts are a fundamental part of the design process.  They play a key role in documenting decision decisions. Kelly Johnson of the Lockheed Skunk Works (which was responsible for creating the U2, the SR-71, and F117) had 14 rules to allow flexibility and rapid progress in the Skunk Works {{project-wiki:artifacts:kellys-14-rules.pdf|(Skunk Works Rules)}}. Two of these rules that are related to artifacts are "A very simple drawing and drawing release system with great flexibility for making changes must be provided", and "There must be a minimum number of reports required, but important work must be documented thoroughly." As you consider what artifacts are necessary, we believe it is helpful to think of the decision you are making and how it relates to the needed artifacts.
  
 ^  Decision levels and their required artifacts.  ^^^^ ^  Decision levels and their required artifacts.  ^^^^
project-wiki/artifacts/decision_levels.1692210863.txt.gz · Last modified: 2023/08/16 12:34 by mlhicks