User Tools

Site Tools


project-wiki:syllabus:grading

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
project-wiki:syllabus:grading [2022/08/30 15:13]
cds4byu [Grading Algorithm]
project-wiki:syllabus:grading [2023/08/15 16:21] (current)
mlhicks
Line 1: Line 1:
-<-Capstone Time Management^.:home|Syllabus^Capstone Policies->+<-^.:home|Syllabus^Capstone Policies->
 =====Capstone Grading===== =====Capstone Grading=====
  
Line 36: Line 36:
 ==Individual Assignment and Exam Scores== ==Individual Assignment and Exam Scores==
  
-5% of your grade is based on the scores you earn on individual assignments and team discussion.  An assignment is and discussion sheet are given for every instructional class period.  +5% of your grade is based on the scores you earn on individual assignments and team discussion.  An assignment and discussion sheet are given for every instructional class period.  
  
 6% of your grade is based on Product Development exam, which is given on Learning Suite during the scheduled final exam time.   6% of your grade is based on Product Development exam, which is given on Learning Suite during the scheduled final exam time.  
Line 60: Line 60:
 ===Team Product Development Score=== ===Team Product Development Score===
  
-The Team Product Development Score is a weighted sum of the Team Project Performance score (70% of the final grade)the Team Professionalism score (10% of final grade), and the Individual Project Contribution score (10% of the final grade).+The Team Product Development Score is a weighted sum of the Team Project Performance score (70% of the final grade) and the Team Professionalism score (10% of final grade).
  
 ==Team Project Performance Score== ==Team Project Performance Score==
project-wiki/syllabus/grading.1661894022.txt.gz ยท Last modified: 2022/08/30 15:13 by cds4byu