This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
project-wiki:tools:home [2024/06/25 16:18] mlhicks [Project Management] |
project-wiki:tools:home [2024/06/25 16:18] (current) mlhicks [Tuckman Team Stages] |
||
|---|---|---|---|
| Line 18: | Line 18: | ||
| A [[safety_plans|Safety Plan]] may be needed before your team begins hardware testing. | A [[safety_plans|Safety Plan]] may be needed before your team begins hardware testing. | ||
| ====Software Resources==== | ====Software Resources==== | ||
| - | We have a list of [[Software Resources]] | + | We have a list of [[Software Resources]] available to help you complete the engineering work on your project. |
| ====Team Member Effectiveness==== | ====Team Member Effectiveness==== | ||
| Effective teams require effective team members. | Effective teams require effective team members. | ||
| ====Tuckman Team Stages==== | ====Tuckman Team Stages==== | ||
| - | Like all teams, your Capstone team will need to learn how to work together effectively, | + | Like all teams, your Capstone team will need to learn how to work together effectively, |
| ====Wiring Tips==== | ====Wiring Tips==== | ||
| For electrical projects, good wiring can make the difference between success and failure. Good wiring practices not only facilitate proper connections and troubleshooting, | For electrical projects, good wiring can make the difference between success and failure. Good wiring practices not only facilitate proper connections and troubleshooting, | ||