=====Winter Semester Student At-A-Glance===== <-fall_semester_student|Fall Semester Student At-A-Glance^at-a-glance_schedules|At-A-Glance Schedules^-> [[https://byu.app.box.com/file/1237910510852|Download xlsx]] Note to Instructors: This page is automatically created by the current year's AtAGlanceMaker.xlsm, which is available in the current year folder [[https://byu.app.box.com/folder/140700212662|on Box at Capstone-Master/Capstone Wiki Support Files]]. Make the changes in AtAGlanceMaker.xlsm so they will be consistent with the Excel Schedule. See [[Editing At-A-Glance Schedules]] for more information. |< 100% 7% 7% 7% 7% 1% 24% 13% 10% 10% 1% 13% >| | | Weekly ||| | As Scheduled |||| | Twice Per Semester | | Date | Team Meeting with Sponsor | Update Individual Contribution Worksheet | Submit Weekly Report | | Class and Other Capstone-scheduled Meetings | Submit Instructional Packet (Sat, 11:59 PM) | Design Reviews | Submit Review Materials | | Evaluations | | Week of 1/8 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 1/10 | | ☐ Monday, 1/8, 8:00-8:50: Semester Kickoff -- Winter Planning Review, Subsystem Engineering Instruction - All together | | | N/A | | | | Week of 1/15 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 1/17 | | ☐ Winter Planning Reviews | ☐ IP1 -- Subsystem Engineering | ☐ Winter Planning Reviews
(Chosen or Assigned Date and Time)
| N/A | | | | Week of 1/22 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 1/24 | | ☐ Process Customization Pod Instruction
(Chosen or Assigned Date and Time)
| ☐ IP2 -- Process Customization | | | | | | Week of 1/29 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 1/31 | | ☐ Risk/FMEA Pod Instruction and Team Leader Training, Friday, Feb 2, 9:00 AM in EB Event Space
(Chosen or Assigned Date and Time)
| ☐ IP3 -- Risk/FMEA | | | | | | Week of 2/5 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 2/7 | | ☐ Product Development Economics Pod Instruction (Chosen or Assigned Date and Time) | ☐ IP4 -- Product Development Economics | | | | | | Week of 2/12 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 2/14 | | ☐ System Refinement Pod Instruction
(Chosen or Assigned Date and Time)
| ☐ IP5 -- System Refinement | | | | ☐ February Peer
☐ February Coach
| | Week of 2/19 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 2/21 | | ☐ Poster Workshop, Tuesday, Feb 20, 9:00 AM, EB Event Space. | | | | | ☐ Coach assigns mid-semester Individual Contribution grades | | Week of 2/26 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 2/28 | | ☐ Subsystem Engineering Reviews | ☐ Draft of Project Poster (due 3/1) | ☐ Subsystem Engineering Reviews Start
(Chosen or Assigned Date and Time)
| ☐ 3 days before SSE Review
(Assigned Date), 10:00 AM
| | | | Week of 3/4 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 3/6 | | | | ☐ Subsystem Engineering Reviews End
(Chosen or Assigned Date and Time)
| | | | | Week of 3/11 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 3/13 | | | | | | | | | Week of 3/18 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 3/20 | | ☐ Design Fair Dry Run | ☐ Revised Final Project Poster Due 3/20 | ☐ Final Project Description due by Email, 3/22 | | | | | Week of 3/25 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 3/27 | | ☐ Notify instructor and Lisa or Allyson of scheduled time and place for Final Design Presentation | ☐ Final Project Poster Due 3/27 |
System Refinement reviews begin
(Chosen or Assigned Date and Time)
| ☐ 3 days before SR Review
(Assigned Date), 10:00 AM
| | | | Week of 4/1 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 4/3 | | ☐ System Refinement Reviews and Final Presentations to Sponsor (prefer 4/4 between 8:00 and 10:00 AM) | ☐ Capstone Design Fair, Thursday, 4/4 (11 - 1 pm) | ☐ System Refinement reviews end
(Chosen or Assigned Date and Time)
| | | | | Week of 4/8 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 4/10 | | | | | | | | | Week of 4/15 | ☐ (Assigned Date) | ☐ (Assigned Date) | ☐ Wed, 4/17 | | ☐ Final Exam Review (optional, Thur 4/18) Final Exam (on Learning Suite), Saturday, April 20, 2:30 PM to 5:30 PM | | | ☐ Final report 4/17 | | ☐ April Peer
☐ April Coach
☐ Online Course
| | Week of 4/22 | N/A | N/A | N/A | |
☐ Capstone Checkout (complete by 4/24)
| | | | | ☐ Coach assigns final Individual Contribution grades | |Table revision 2.9 made from AtAGlanceMaker revision 1.8|||||||||||